These roadworks will affect traffic travelling along the main A25 Newry Road Camlough from jct Quarter Road to jct with Lowes Lane ( that is for a distance of about about 500m).
One lane of the carriageway will remain open during the duration of the roadworks and traffic flow will be maintained by either traffic lights or stop/go boards.
The land closure is to facilitate the installation of a replacment foul pumping main. The new pumping main will be taken the existing Camlough Cross Pumping Station out onto the Newry Road. The pipe will laid toward Newry for approx 500m. The pipe will the discharge into a new manhole just off the road
Drivers are asked to allow more time for their journey.
Contractor contact details
BSG Civil Engineering Ltd
Contracts Manager
Stephen Gribbin
07736887491